Free Shipping on orders over US$39.99 mail:[email protected]

Preparation Date Before Installation of Electric Ball Valve

SaveSavedRemoved 0
Deal Score0
Deal Score0

When we want to install the electric ball valve, the editor would like to remind you, don’t rush to install it first, we still need to do some preparations. When we are ready, things will go smoother. This is the eternal truth. It’s perfect to use here. Let’s take a look at what preparations have to be done.

The preparation before installation of the electric ball valve:

1. The pipelines before and after the ball valve are ready. The front and rear pipes should be coaxial, and the sealing surfaces of the two flanges should be parallel. The pipeline should be able to bear the weight of the ball valve, otherwise the pipeline must be equipped with proper support.

2. Clean the pipelines before and after the valve to remove the oil, welding slag and all other impurities in the pipeline.

3. Check the mark of the ball valve to find out that the ball valve is intact. Fully open and close the valve several times to confirm that it is working properly.

4. Remove the protective parts on the connecting flanges at both ends of the ball valve.

5. Check the valve hole to remove possible dirt, and then clean the valve hole. Even small foreign matter between the valve seat and the ball may damage the seat sealing surface.

The above five points, I hope you can understand it carefully. We wholeheartedly provide you with the services you need and the best quality electric ball valve products.

Tags:

Labideal
Logo
Register New Account
Compare items
  • Total (0)
Compare