Vacuum Valve Cleaned Parts Sealed and Stored
SaveSavedRemoved 0
Deal Score0
- The installation workshop
- must be clean, or a temporary clean area should be set up, such as using a newly purchased color strip or plastic film to prevent dust from entering during the installation process.
- The assembler is wearing clean overalls, wearing a cap, hair should not leak, wearing clean shoes, wearing plastic gloves in hand, and degreasing.
- Degrease and clean before assembling tools to ensure cleanliness.
Other requirements
- The assembled valve is purged with nitrogen for at least 1 minute.
- Air tightness test is using pure nitrogen.
- After the airtight test is passed, it is sealed and sealed with a clean polyethylene cap. The polyethylene cap should be soaked in organic solvent and wiped clean before use.
- Then sealed with a vacuum bag.
- Rear packing.
6.Take measures to ensure that the package is not damaged during transportation.
View more vacuum valves with low price and free shipping all over the world.